RMC M30 and M35
High grades for special members, by design only
Batch slip with every truckCertified plantsCube casting on request
Specification
| Standard | IS 4926, design mixes M30 and M35 |
|---|---|
| Use | Transfer members, long cantilevers, basements, per drawing |
| Mix design | Plant design mix approved before first pour |
| Admixtures | Superplasticiser standard at these grades |
| Quality | Cube results traceable to truck and batch |
| Documents | Batch slip per truck, mix design shared |
Supply
| Sold | Per cubic metre |
|---|---|
| Minimum | 3 cubic metres |
| Delivery | Across Bengaluru, ORR plus 25 km |
| Lead time | Usually 24 to 48 hours from order confirmation |
| Brands | House and named brands |
Typical terms, not commitments. The quote confirms them for your quantity and pincode.
Details
Grades for the members your engineer loses sleep over. At M30 and above the mix design, the admixture dosing and the cube trail are the product as much as the concrete is. All three come documented.
Variants
M30Pump and non-pump
M35Pump mix, superplasticised
From the site engineer's deskApprove the mix design before the pour date, not on it. We send the plant's design with the quotation for your engineer to sign off.