
Photo: 200degrees (Pixabay Content License)
RMC M25
For heavier members and stricter designs
Batch slip with every truckCertified plantsCube casting on request
Specification
| Standard | IS 4926, design mix M25 |
|---|---|
| Use | Columns, footings, stilt floors, G plus 2 and above frames |
| Slump | Stated at order, verified at site on request |
| Cement content | Per approved mix design, shared on request |
| Options | Pump and non-pump, admixtures per design |
| Documents | Batch slip per truck, mix design on request |
Supply
| Sold | Per cubic metre |
|---|---|
| Minimum | 3 cubic metres |
| Delivery | Across Bengaluru, ORR plus 25 km |
| Lead time | Usually 24 to 48 hours from order confirmation |
| Brands | House and named brands |
Typical terms, not commitments. The quote confirms them for your quantity and pincode.
Details
Where the structural design steps up, usually from G plus 2, M25 becomes the frame grade. Plant batching earns its keep here: water control by the litre, not by the mason's bucket.
Variants
Pump mixFor boom or stationary pump placement
Non-pump mixDirect chute or manual placement
From the site engineer's deskA slump test at the truck takes five minutes. Any truck that fails the ordered slump goes back, and the batch slip is your record.
Today's rate for RMC M25


